Theater and Concert Hall.

Torredembarra, Tarragona, Catalunya.

With a budget of €2 million, it should have been opened in 2009. The construction was stopped in 2010, after having spent €4 million. If it is not opened by the end of 2015, the City will have to return a subsidy fo almost €1 million. In order to avoid that, the plan is to condition the lobby, and put a moving stage so it is possible to have small-format productions or us it as exhibition hall.