Highway A-40 Ocaña-Cuenca.

Santa Cruz de la Zarza, Toledo, Castilla-La Mancha.

This is stretch had in 2013 a traffic volume of 3,800 daily vehicles, therefore not even reaching 40% of the volume that engineers consider necessary for justifying the construction of a highway. The total cost for this stretch was €435 million.