High-Speed Rail Line Valladolid-Vitoria.

Cabezón de Pisuerga, Valladolid, Castilla y León.

Cost-benefit analysis show that a HSR-corridor can be regarded as socially beneficial when it carries 8 million passengers a year. In the case of Valladolid, Burgos and Vitoria, it would mean that each inhabitant takes the high-speed train eleven times every year. The cost of the line is estimated to around €4.3 billion.