High-Speed Rail Line Madrid-Galicia.

Otero de Bodas, Zamora, Castilla y León.

The oversize of the HSR-network is rarely as visible as in this corridor. With the aim of saving over €3.8 billion (half of the initial investment), the project was modified by lowering the maximum speeds, and introducing single-track stretches. However, it is not expected that these cutbacks will have a significant impact on the travel time, because there is not much traffic expected.